0845 094 9240

Air Conditioning Inspections

Air conditioning systems can account for 50% of the energy used in a building, and are therefore specifically targeted in new government legislation, which makes regular inspection mandatory. The dates by which inspections have to take place vary according to the size of the system. These are summarised below:-

  • for air-conditioning systems, where the effective rated output is more than 250kW the first inspection must have happened by 4 January 2009.
  • for air-conditioning systems, where the effective rated output is more than 12kW the first inspection must have happened by 4 January 2011.
  • for all systems first put into service on or after 1 January 2008, the first inspection must have taken place within five years of the date when it was first put into service ie after acceptance of the completion of the commissioning of the system.

Envos can advise you or your clients and help you comply with this legislation with an Envos Air Conditioning Inspection Report, which:-

  • Provides information about system performance.
  • Identifies opportunities to reduce CO2 emissions so saving energy and reducing costs.
  • Highlight measures, which, if adopted will potentially save energy and money within a reasonable payback period.

Please download our briefing paper for more information

quotation-enquiry